Verify it's really you

Please re-enter your password to continue with this action.

Published on Aug 20, 2025
Daily PIB Summaries
PIB Summaries 20 August 2025
PIB Summaries 20 August 2025

Content

  1. The Solar Surge: India’s Bold Leap Toward a Net Zero Future
  2. Minimum Support Prices (MSPs) for all crops

The Solar Surge: India’s Bold Leap Toward a Net Zero Future


Basic Context & Global Position

  • Current Global Rankings (2025):
    • 3rd largest solar power producer globally (overtook Japan)
    • 4th in renewable energy installed capacity worldwide
    • 4th in wind power capacity
    • 3rd in solar power capacity
  • Key Production Milestone:
    • India: 108,494 GWh solar energy generated
    • Japan: 96,459 GWh (now behind India)

Solar Capacity Breakdown (July 2025)

  • Total Solar Capacity: 119.02 GW
    • Ground-mounted solar: 90.99 GW (76%)
    • Grid-connected rooftop: 19.88 GW (17%)
    • Hybrid projects: 3.06 GW (3%)
    • Off-grid installations: 5.09 GW (4%)
  • Growth Rate: 4,000% increase in solar capacity over recent years
  • Total Solar Potential: 748 GW across India


Relevance : GS 3(Energy Security , Environment and Ecology)

Geographic Distribution & High-Potential States

  • Northern & Western Region:
    • Rajasthan, Gujarat (highest potential)
  • Southern & Central Region:
    • Karnataka, Tamil Nadu, Andhra Pradesh
  • Eastern & Other Regions:
    • Maharashtra, Chhattisgarh, Odisha
  • Notable Achievement: Palli village (J&K) became India’s first carbon-neutral panchayat

Manufacturing Capacity Revolution

  • Solar Module Manufacturing:
    • March 2024: 38 GW capacity
    • March 2025: 74 GW capacity (95% increase in one year)
  • Solar PV Cell Manufacturing:
    • March 2024: 9 GW capacity
    • March 2025: 25 GW capacity (178% increase)
  • New Milestone: First ingot-wafer manufacturing facility (2 GW) operational
  • Historical Growth (2014-2025):
    • PV cells: 1.2 GW → 25 GW (21x increase)
    • PV modules: 2.3 GW → 78 GW (34x increase)

Government Policy Support

  • Import Protection:
    • Basic Customs Duty (BCD) on imported solar cells/modules (April 2022)
    • Mandatory use of Indian-made products in government schemes
  • Key Schemes Requiring Domestic Components:
    • Rooftop Solar Programme
    • PM-KUSUM
    • CPSU Scheme Phase II

Major Government Initiatives

PM Surya Ghar: Muft Bijli Yojana

  • Budget: ₹75,021 crores
  • Target: 1 crore households
  • Benefit: Up to 300 units free electricity monthly
  • Subsidies:
    • 1 kW: ₹30,000
    • 2 kW: ₹60,000
    • 3 kW+: ₹78,000
  • Savings: ₹15,000 annually even after loan EMI

PM-KUSUM Scheme

  • Focus: Farmer solar adoption
  • Subsidies: 30-50% for solar pumps
  • Capacity: Up to 2 MW solar plants per farmer
  • Revenue: Farmers can sell electricity to DISCOMs

Solar Parks Scheme

  • Target: 40 GW by March 2026
  • Approved: 53 parks (39,323 MW capacity) across 13 states
  • Operational: 13,896 MW across 26 parks
  • Status: 18 parks fully developed (10,856 MW)

PM JANMAN Initiative

  • Budget: ₹515 crores
  • Target: 1 lakh un-electrified tribal households
  • Coverage: 18 states, focusing on PVTGs

Innovative Solar Technologies

  • Floating Solar:
    • Omkareshwar Floating Solar Park (Madhya Pradesh)
    • Capacity: 600 MW planned
    • Cost: ₹330 crores
    • Benefits: Land conservation, higher efficiency
  • Agrivoltaics:
    • Dual land use: solar + farming
    • Examples: Sun master Plant (Delhi), 105 KW ICAR system (Jodhpur)
    • Benefits: Increased farmer income, efficient land use

Global Leadership Initiatives

International Solar Alliance (ISA)

  • Founded: 2015 by India and France at COP21
  • Members: 100+ countries
  • Investment Target: $1 trillion by 2030
  • Focus: LDCs and Small Island Developing States

One Sun One World One Grid (OSOWOG)

  • Launched: 2018 at ISA Assembly
  • Vision: Global solar grid connectivity
  • Coverage: South Asia to Africa and Europe
  • Concept: “The sun never sets” – continuous solar supply

Overall Renewable Energy Context

  • Total Power Capacity: 484.82 GW
  • Renewable Share: 50.07% (achieved COP26 target 5 years early)
  • Non-fossil Fuel Capacity: 242.8 GW (June 2025)
  • Breakdown:
    • Renewable energy: 233.99 GW
    • Nuclear: 8.8 GW
  • Energy Mix:
    • Thermal: 242 GW
    • Solar: 116 GW
    • Wind: 51.6 GW

Growth Trajectory & Achievements

  • 2024-25 Record: 29.52 GW renewable capacity added
  • 11-Year Growth: RE capacity grew 3x (76.37 GW in 2014 → 233.99 GW in 2025)
  • 2030 Target: 500 GW non-fossil fuel capacity

Supporting Renewable Technologies

Wind Energy

  • Capacity: 51.6 GW (4.15 GW added in FY 2024-25)
  • Global Rank: 4th in onshore wind
  • Potential: 1,164 GW
  • Contribution: 4.56% of total electricity generation

Bioenergy

  • Capacity: 11.60 GW (including waste-to-energy)
  • Budget: ₹1,715 crores (National Bioenergy Programme 2021-2026)
  • Components: Waste-to-energy, biomass, biogas, biofuel blending

Ethanol Blending

  • Current Status: 17.98% blending (February 2025)
  • Target: 20% by 2025-26 (ahead of 2030 original target)
  • Global Position: 3rd largest ethanol producer and consumer

Green Hydrogen

  • Mission Target: 5 million tonnes annually by 2030
  • Investment: ₹8 lakh crore expected
  • Job Creation: 6 lakh jobs
  • Import Savings: ₹1 lakh crore in fossil fuel imports
  • Hub Ports: Kandla, Paradip, Tuticorin

Recent Policy Developments (2025)

  • July 2025: ₹7,000 crore exemption for NLC India Ltd
  • NLC Expansion Plan:
    • Current: 2 GW
    • 2030 target: 10 GW
    • 2047 target: 32 GW

Five Key Strategic Priorities for 2030

  1. Better Contracts: Long-term power purchase agreements
  2. Stronger Grids: Modern infrastructure with battery storage
  3. Make in India: Boost local manufacturing
  4. Smart Land Use: Floating solar, agrivoltaics
  5. Easy Financing: Accessible funding mechanisms

International Commitments & Progress

Paris Agreement NDCs

  • Carbon Intensity: 45% reduction by 2030 (vs 2005 levels)
  • Non-fossil Capacity: 50% by 2030 (achieved 5 years early)
  • Net Zero Target: 2070

COP26 Commitments (Panchamrit)

  • 500 GW non-fossil capacity by 2030
  • Currently on track with accelerated progress

Strategic Impact & Benefits

  • Energy Security: Reduced dependence on coal imports
  • Economic Benefits: Job creation across renewable value chain
  • Rural Development: Farmer income enhancement through solar initiatives
  • Manufacturing: Domestic production reducing import dependency
  • Innovation: Leadership in floating solar, agrivoltaics, green hydrogen

Challenges & Future Outlook

Infrastructure Requirements

  • Grid modernization for renewable integration
  • Energy storage solutions for intermittency
  • Transmission infrastructure development

Policy Success Factors

  • Import duties protecting domestic manufacturing
  • Subsidy schemes driving adoption
  • Mandatory domestic content requirements
  • Long-term policy consistency

Conclusion: Key Success Indicators

  • Speed of Achievement: Major targets met ahead of schedule
  • Comprehensive Approach: Technology + policy + manufacturing + international cooperation
  • Social Impact: Rural electrification, farmer empowerment, tribal community inclusion
  • Economic Transformation: From energy importer to potential exporter
  • Global Leadership: ISA, OSOWOG initiatives positioning India as renewable energy leader

MINIMUM SUPPORT PRICES (MSPS)FOR ALL CROPS


What is MSP?

  • Definition: Government-guaranteed minimum price for agricultural crops to protect farmers from price volatility
  • Coverage: 22 mandated agricultural crops across India
  • Authority: Commission for Agricultural Costs & Prices (CACP) recommends MSP rates
  • Frequency: Fixed annually by the Government of India
  • Implementation: Digital payment system for MSP procurement

Relevance : GS 2(Governance) , GS 3(Agriculture)

Decision-Making Process

  • Primary Recommender: Commission for Agricultural Costs & Prices (CACP)
  • Consultation Process: Views from State Governments and Central Ministries/Departments
  • Final Authority: Central Government fixes final MSP rates
  • Scope: Applied uniformly across the country

MSP Performance Data (2024-25: July to June)

Quantitative Achievements

  • Total Procurement: 1,175 lakh metric tonnes (117.5 million metric tonnes)
  • MSP Amount Paid: ₹3.33 lakh crores (₹33,300 billion)
  • Farmers Benefitted: 1.84 crores (18.4 million farmers)

Key Metrics Analysis

  • Average MSP per farmer: ₹18,098 per farmer (₹3.33 lakh crores ÷ 1.84 crore farmers)
  • Average procurement per farmer: 6.38 metric tonnes per farmer
  • Average price per metric tonne: ₹28,340 across all crops

Current Policy Status

Loan Waiver Status

  • No active loan waiver scheme currently operational in Department of Agriculture & Farmers Welfare
  • Alternative approach: Structured financial support through multiple targeted schemes

Digital Infrastructure

  • Payment System: Digital payment implementation for MSP procurement
  • Transparency: Enhanced through digital systems
  • Efficiency: Reduced transaction costs and time

Supporting Agricultural Schemes

Pradhan Mantri Kisan Samman Nidhi (PM-KISAN)

Basic Structure

  • Launch Date: February 2019
  • Scheme Type: Central Sector Scheme
  • Annual Benefit: ₹6,000 per eligible farmer
  • Payment Structure: Three equal installments of ₹2,000 each
  • Target Group: Land-holding farmers

Financial Performance

  • Total Disbursement: Over ₹3.69 lakh crores since inception
  • Installments Completed: 19 installments (as of August 2025)
  • Payment Method: Direct Benefit Transfer (DBT) to Aadhaar-seeded bank accounts
  • Transparency Features: Complete digital verification and registration process

Impact Analysis

  • Average annual disbursement: ≈₹56,000 crores per year (₹3.69 lakh crores ÷ 6.5 years)
  • Estimated beneficiaries: ≈9.3 crore farmers (based on ₹6,000 per farmer annually)

Pradhan Mantri Fasal Bima Yojana (PMFBY)

Scheme Overview

  • Launch: Kharif 2016 season
  • Purpose: Crop insurance against natural calamities and adverse weather
  • Objective: Income stabilization for farmers

Financial Performance (2016-2025)

  • Farmers’ Premium Paid: ₹35,753 crores
  • Claims Paid to Farmers: ₹1.83 lakh crores (as of June 30, 2025)
  • Benefit Ratio: 5:1 (claims received vs. premium paid)
  • Net Benefit to Farmers: ₹1.47 lakh crores (₹1.83 lakh – ₹0.36 lakh crores)

Coverage and Impact

  • Risk Coverage: Natural calamities, adverse weather, pest attacks
  • Financial Protection: Comprehensive crop loss compensation
  • Affordability: Low premium burden for farmers due to government subsidies

Modified Interest Subvention Scheme (MISS)

Scheme Structure

  • Funding: 100% centrally funded
  • Coverage: All States and Union Territories
  • Target: Short-term agricultural loans through Kisan Credit Cards (KCC)
  • Benefit: Concessional interest rates for working capital requirements

Five-Year Financial Performance (2020-25)

Year Disbursement (₹ Crores) Year-on-Year Change
2020-21 17,789.72
2021-22 21,476.93 20.7%
2022-23 17,997.88 -16.2%
2023-24 14,251.92 -20.8%
2024-25 17,811.72 25.0%

Analysis of Trends

  • Total Disbursement (5 years): ₹89,328.17 crores
  • Average Annual Disbursement: ₹17,866 crores
  • Peak Year: 2021-22 (₹21,477 crores)
  • Recent Recovery: 25% increase in 2024-25 after two years of decline

Agriculture Infrastructure Fund (AIF)

Scheme Background

  • Launch Year: 2020
  • Initiative: Part of Atmanirbhar Bharat package
  • Scheme Type: Central Sector Scheme
  • Primary Focus: Post-harvest management and community farming assets

Financial Framework

  • Total Fund Size: ₹1 lakh crore loan facility
  • Interest Rate Cap: Maximum 9% on loans
  • Loan Type: Medium to long-term debt financing
  • Lending Mechanism: Through established financial institutions

Performance as of June 30, 2025

  • Sanctioned Amount: ₹66,310 crores (66% of target achieved)
  • Projects Sanctioned: 1,13,419 projects
  • Total Investment Mobilized: ₹1,07,502 crores
  • Leverage Ratio: 1.6:1 (total investment vs. sanctioned amount)

Project Category Breakdown

  • Custom Hiring Centres: 30,202 projects (26.6%)
  • Processing Units: 22,827 projects (20.1%)
  • Warehouses: 15,982 projects (14.1%)
  • Sorting & Grading Units: 3,703 projects (3.3%)
  • Cold Storage Projects: 2,454 projects (2.2%)
  • Other Post-harvest Projects: 38,251 projects (33.7%)

State-wise Allocation

  • Allocation Basis: Ratio of total value of output of Agriculture and Allied sectors
  • Coverage: All States and Union Territories
  • Decentralized Implementation: State-specific project approval and monitoring

Integrated Analysis of Agricultural Support System

Financial Scale and Impact

  • Combined Annual Support: Approximately ₹60,000+ crores across all schemes
  • Direct Beneficiaries: 10+ crore farmers across different schemes
  • Infrastructure Development: 1+ lakh projects under AIF alone
  • Risk Mitigation: Comprehensive crop insurance with 5:1 benefit ratio

Policy Approach: No Loan Waiver Strategy

Why No Loan Waiver?

  • Structured Support Preferred: Multiple targeted schemes instead of blanket waivers
  • Sustainability Concerns: Loan waivers can create moral hazard and fiscal burden
  • Comprehensive Coverage: MSP, income support, insurance, infrastructure development

Alternative Support Mechanisms

  • Income Support: PM-KISAN provides direct cash transfers
  • Price Protection: MSP ensures minimum guaranteed prices
  • Risk Coverage: PMFBY provides comprehensive crop insurance
  • Credit Support: MISS reduces borrowing costs
  • Infrastructure: AIF develops post-harvest facilities

Technology Integration

  • Digital Payments: MSP procurement through digital systems
  • Aadhaar Integration: PM-KISAN uses Aadhaar-seeded accounts
  • DBT Implementation: Direct Benefit Transfer reduces leakages
  • Transparency: Digital systems ensure accountability

MSP System Challenges

  • Limited Crop Coverage: Only 22 crops out of hundreds grown
  • Geographic Concentration: MSP procurement mainly in certain states
  • Storage and Logistics: Infrastructure constraints in procurement
  • Price Discovery: Market prices often below MSP for many crops

Scheme-specific Challenges

PM-KISAN

  • Landholding Requirement: Only land-owning farmers eligible
  • Small Amount: ₹6,000 annually may be insufficient for meaningful impact
  • Documentation: Requires proper land records

PMFBY

  • Claim Settlement: Delays in claim processing
  • Coverage Gaps: Some risks not covered
  • Premium Burden: Even subsidized premium can be high for marginal farmers

MISS

  • KCC Penetration: Not all farmers have Kisan Credit Cards
  • Documentation Requirements: Formal credit procedures
  • State Variations: Implementation quality varies across states

AIF

  • Loan-based: Requires repayment capacity
  • Technical Expertise: Need for project preparation and management
  • Collateral Requirements: May limit access for small farmer

Future Outlook and Recommendations

Strengthening MSP System

  • Expand Crop Coverage: Include more crops in MSP framework
  • Improve Procurement Infrastructure: Better storage and logistics
  • Market Integration: Link MSP with market development
  • Price Rationalization: Regular review of MSP calculation methodology

Enhancing Support Schemes

  • Universal Coverage: Extend benefits to tenant farmers and agricultural laborers
  • Amount Rationalization: Increase PM-KISAN amount based on inflation
  • Technology Upgrade: Further digitalization of all processes
  • Convergence: Better coordination between different schemes

Infrastructure Development

  • Accelerate AIF Implementation: Achieve full ₹1 lakh crore target
  • Value Chain Development: Focus on processing and marketing infrastructure
  • Technology Adoption: Promote modern agricultural technologies
  • Climate Resilience: Develop climate-smart infrastructure